Showing posts with label Southrail. Show all posts
Showing posts with label Southrail. Show all posts
Wednesday, October 29, 2008
Monday, September 22, 2008
Concrete Ties Production at PNR Caloocan
RIHSPI Weekend Trip: September 20, 2008.
Pre-stressed concrete ties stored beside Horace Higgins Hall, Philippine National Railways Compound, Caloocan City.
RIHSPI members followed the rows of pre-stressed concrete ties and discovered the production area inside the Engineering Department compound of PNR.
More pre-stressed concrete ties stored inside the compound.
A peek inside the mold.
Workers busy preparing the steel bars with Pandrol shoulders.
An unknown machine being used to prepare the steel bars.
The concrete mix plant.
Pouring concrete inside the mold.

Preparing for hardening. Twenty four hours under the canvas with steam.
Special thanks to Mr. Anonuevo for letting us view the production process. Mr. Anonuevo learned the production process from John Holland in the early 1990s.
Thursday, September 11, 2008
Monday, September 1, 2008
Southrail Update
New shed at Tutuban. August 31, 2008.
Newly refurbished locoshed at Tutuban. August 31, 2008.
Inside the newly refurbished locoshed at Tutuban. August 31, 2008.
Paco Station, August 23, 2008.FTI ROW Taguig near C5 SLEX exit. August 22, 2008.
FTI ROW, view on top of C5 SLEX exit, August 22, 2008.
Saturday, August 9, 2008
Tuesday, March 25, 2008
Hondagua Visit
More pictures of Hondagua here.
Wednesday, March 19, 2008
Work on a Maundy Thursday

A small group of Hanjin workers were seen working on a Maundy Thursday. Kudos to Project Manager Kim Il Hwan for making this possible and for rushing the rehabilitation of the Manila Belt Line in time for the 100th anniversary this coming March 25, 2008. Photo above shows the team working and already reached the curve near the South Super Highway.
Monday, October 1, 2007
Cabuyao-Calamba Railways Sneak Preview
More pictures to follow...
Saturday, September 15, 2007
San Pedro Railroad Scenes
Paco Station
Paco Station, September 2007. The station will be 100 years old soon.
Plaza Dilao and Paco Station. September 2007. More funds were given to beautify this park than the station at the back.
PNR tracks at the back of Paco Station. September, 2007. The Manila Mayor needs more than just road sweeping to clear the shopping mall mess beside the Paco station.
Thursday, September 13, 2007
PNR 921
Friday, August 10, 2007
Google Earth Philippine Railroad Triangle Collection
Caloocan Railroad Triangle, Metro Manila

Luta Railroad Triangle, Malvar, Batangas

Mamatid Railroad Triangle, Cabuyao, Laguna

San Fernando Railroad Triangle, San Fernando, La Union

Rosario Railroad Triangle, Rosario, La Union

Luta Railroad Triangle, Malvar, Batangas

Mamatid Railroad Triangle, Cabuyao, Laguna

San Fernando Railroad Triangle, San Fernando, La Union

Rosario Railroad Triangle, Rosario, La Union

Labels:
Baguio Line,
Batangas Line,
Northrail,
Railroad Images,
Southrail
Subscribe to:
Posts (Atom)